Localisation | Kolwezi DR Congo |
Ownership | 72% |
Project status | In operation + under Construction |
Deposit Type | Sediment-hosted strata copper-cobalt deposit |
Mineral resources (inclusive of Mineral Reserves) | Contained copper of 2.41Mt with grade of 3.91% and cobalt of 64.7kt with grade of 0.11 |
Mining & Processing method | Open-pit mining hydrometallurgy |
2022 Production | Mined Copper 128kt; Mined Cobalt 2.506t |